PROJECT OVERVIEW

The Watershed Bristol – Timber Doors, Louver Screens & Structural Steel Refurbishment

Project Overview

SH Decorating Services were appointed to carry out specialist preparation and refurbishment works to several large timber entrance doors, timber louver screens, structural steel RSJ sections, and associated metalwork at Watershed.

The project required extensive preparation, timber repairs, corrosion treatment, and the application of high-performance coating systems within a busy city centre environment with constant pedestrian movement.

Works were carefully phased and managed to minimise disruption to the public, neighbouring businesses, and building occupants while maintaining strict safety and quality control procedures throughout the duration of the project.

Scope Of Works

The project involved the refurbishment and protection of:

Large timber entrance doors, timber louver screen panels and structural steel RSJ sections.

Due to the age and exposure of the existing substrates, both the timber and steel elements had suffered from coating failure, weathering, corrosion, localised deterioration and rot.

Large Timber Doors & Louvres

Full preparation, and timber repairs including weather shield coating protection ,within live public access environment

Structural Steel RSJ sections

Full Preparation, industrial coating protection works, corrosion protection systems within a live public access environment.

Planning & Safety Management

Prior to commencement of works, detailed planning and safety procedures were implemented to ensure all activities could be carried out safely within a live public environment.
Operatives wore full task-specific PPE throughout the duration of the works and strict housekeeping procedures were maintained at all times to ensure safe working areas and minimise hazards.

Pre-Start Planning Included

  • Site inspections and condition surveys
  • Preparation of detailed Method Statements and Risk Assessments
  • Public protection and pedestrian management planning
  • Access and working-at-height assessments
  • Scheduling works around public access requirements
  • Establishment of controlled working zones

PPE Requirements

  • Safety helmets
  • High-visibility clothing
  • Eye protection
  • Respiratory protection
  • Protective gloves
  • Hearing protection during mechanical preparation
  • Safety footwear

Safety Measures Implemented

Mobile Towers Access

Mobile access towers were utilised throughout the project to safely access elevated timber and steelwork sections. All towers were erected, inspected, and used in accordance with current working-at-height regulations and manufacturer guidance.


Traffic & Pedestrian Control

As works were undertaken within a busy pedestrian area in Bristol city centre, strict segregation procedures were implemented. Installation of Heras fencing systems Clearly displayed “Danger – Keep Out” signage Controlled exclusion zones Ongoing monitoring of pedestrian routes. These measures ensured the safety of members of the public while preparation and coating operations were being carried out.

Metalwork Preparation & Coating System

Surface Preparation

Existing steel RSJ sections and associated metalwork required extensive preparation due to areas of corrosion and coating failure.
Preparation works involved a combination of:

Mechanical preparation methods

Electric sanders

Wire brushing

Abrasive paper hand preparation

All loose and flaking coatings, rust contamination, and unstable substrates were thoroughly removed to achieve a sound surface suitable before cleaning and treatment.

Cleaning & Degreasing

Once preparation was complete, all steel surfaces were thoroughly cleaned and degreased using Rust-Oleum Mathys ND14 Cleaner Degreaser This process ensured the removal of contaminants, oils, and residues Prior to primer application.



Rust Treatment & Priming

Corroded areas were treated using Owatrol Oil Multi-Purpose Rust Inhibitor
Following curing of the rust inhibitor, prepared areas were spot primed with Dulux Zinc Phosphate Primer
This provided additional corrosion resistance and ensured strong adhesion for subsequent coatings.

Protective Coating System

Once priming works had cured, all specified metalwork received: Two full coats of Dulux Metalshield GlossThe selected coating system provided Long-term protection against corrosion Improved durability Enhanced weather resistance A hard-wearing gloss finish in accordance with the client’s specification.


Timber Doors & Louver Screen Refurbishment

Timber Preparation

Large timber doors and louver screen sections required extensive preparation due to deteriorated coatings and areas of timber decay.

Preparation works included:

Mechanical sanding

Hand sanding

Removal of all loose and flaking paint

Removal of rotten and defective timber sections

Once preparation had been completed, all timber surfaces were cleaned and degreased using a ready-mixed sugar soap solution before being thoroughly rinsed.

Timber REPAIRS

Damaged timber sections were repaired by:

Splicing in new timber sections and the application of specialist Repair Care repair systems.

This ensured structural integrity and restored the original profile of the timber elements prior to decoration.

Surface Filling, Priming & Coating System

Prepared timber surfaces received: One coat of Dulux Weathershield Wood Primer Filling of imperfections using a two-pack wood filler system Sanding to achieve a smooth and uniform finish Two coats of solvent-based Dulux Weathershield Undercoat One finishing coat of solvent-based Dulux Weathershield Gloss All finishes were completed to match the client’s specified colour scheme and appearance requirements.




Project Outcome

The completed refurbishment works successfully restored and protected the timber and steel elements of the building while significantly improving overall appearance, durability, and weather resistance. Key project outcomes included: Restoration of deteriorated timber features Long-term corrosion protection to structural steelwork Improved external appearance. High-quality durable finishes in line with client specifications.
The project was completed safely, efficiently, and to a high decorative standard while maintaining strict compliance with site safety and public protection requirements throughout.