Serving Bristol & The Southwest

Case Study


TEMPLE MEADS
RAILWAY STATION

Footbridge & Metal Staircase Refurbishment


Specialist surface preparation and industrial
protective coating works carried out within
a live railway environment.

CORROSION PROTECTION

SAFE WORKING PRACTICES

MINIMUL DISRUPTION TO PUBLIC

HIGH PERFOMANCE SYSTEM

Case Study


THE WATER SHED
BRISTOL

Large tounge and groove door refurbishment


Specialist surface preparation, timber repairs
and commercial protective coating works
carried out within a live public environment.

TIMBER REPAIRS

SAFE WORKING PRACTICES

MINIMUL DISRUPTION TO PUBLIC

HIGH PERFOMANCE SYSTEM

Case Study


Wessex House
Offices

Refurbishment Of 3 Offices After Flood Damage


Specialist surface preparation with high quality
surface coatings carried out within a non-occupied
environment.

WALL
REPAIRS

SAFE WORKING PRACTICES

MINIMUL DISRUPTION TO PUBLIC

HIGH PERFOMANCE SYSTEM

Case Study


NURSERY PORTACABIN

Refurbishment Of a Dilapidated Portacabin


Specialist surface preparation and with high quality
surface coatings carried out within a non-occupied
environment.

WALL
REPAIRS

SAFE WORKING PRACTICES

MINIMUL DISRUPTION TO PUBLIC

HIGH PERFOMANCE SYSTEM